2U 6" Vented Light Duty Rack Shelf Services
Maximize your rack space with our 2U 6″ Vented Light Duty Rack Shelf – designed to hold all of your equipment securely and efficiently. Get yours today and streamline your setup!
- Free quotes within one day
- Lead time as fast as 3-5 days
- ISO 9001:2015 certified
2U 6" Vented Light Duty Rack Shelf Introduction
Our 2U 6″ Vented Light Duty Rack Shelf is a versatile and durable solution for organizing your rack equipment. With vented holes to promote airflow and sturdy construction, this shelf is perfect for home or office use. Here are some of its advantages.
- Efficient use of space: Designed to maximize your rack space, this shelf creates room for additional equipment while keeping your current devices organized.
- Ventilation: The vented holes on the shelf allow for better airflow, keeping your equipment cool and preventing overheating.
- Lightweight yet durable: The light-duty construction means that the shelf won't add unnecessary weight to your rack while still providing a sturdy surface for your equipment.
- Easy to install: Our rack shelf is easy to install and comes with the necessary screws and mounting hardware.
2U 6" Vented Light Duty Rack Shelf specifications
Rack Units (Size U) | 2 |
---|---|
Style | Fixed Solid |
Usable Depth (Inches) | 17 |
Weight Capacity | 150 lb. |
Internal Width (Inches) | 19.00 (EIA Compliant) |
Color | Black (Powder Coat) |
Material | CRS (Cold Rolled Steel) |
The Process Flow & Duration Estimation
Please note that the final cost depends on the customized service you require, the specifications of the raw materials used, the relevant national laws, and the distance of transportation. Take the example of booking a tall container of products:
Step 1: Drawing Design (within 1 day)
Designers use CAD to quickly as well as accurately modify designs to meet the desired specifications, ensuring that the final product meets the required specifications quickly and accurately.
Step 2: Product Proofing (1-2 days)
Product proofing is an essential part of the manufacturing process that can help businesses ensure the quality and consistency of their products while minimizing risks and costs associated with defects or errors in production.
Step 3: Bulk Manufacturing (1-3 days)
Once the specifications and quality of the product are confirmed to be in order, it is ready for mass production.
Step 4: Shipping (3-5 days)
Once the products arrive at their destination, you will receive an alert. You can plan how to collect your shipped goods.
Our Clients Say About Us
The FAQs About 2U 6" Vented Light Duty Rack Shelf
What is the shelf made of?
The shelf is made of high-quality steel with a vented design that allows for maximum airflow.
Is the shelf easy to install?
Yes, the shelf comes with all the necessary hardware for easy installation and can be set up in just a few minutes.
Is the shelf compatible with other rack accessories?
Yes, the shelf is compatible with a wide range of rack accessories, including cable management panels and power strips.
Does the shelf require any special tools for installation?
No, the shelf can be installed using standard tools such as a screwdriver and a wrench.
Is the vented design of the shelf important?
Yes, the vented design allows for greater airflow, which helps to keep server equipment cool and running efficiently.
Can multiple shelves be installed in the same server rack?
Yes, multiple shelves can be installed side-by-side in the same server rack to accommodate additional equipment.
How do I clean the shelf?
The shelf can be wiped clean with a damp cloth or cleaned with a mild cleaning solution.
Is the shelf compatible with rack-mountable servers?
Yes, the shelf is compatible with rack-mountable servers and can help to improve organization and airflow in server racks.
Get A Free Quote
Contact us to get a free quote and more expertise about sheet metal fabrication. Your project will meet the right solution with Shengen.
Custom Sheet Metal Fabrication with Easy
At Shengen, We turn complex Into Simple! Follow the following three steps to start today!
- Tell us as specific as possible of your needs, provide the drawing, reference picture and share your idea.
- We will work on the best solution according to your requirements and drawing, the specific quote will be provided within 24 hours.
- We will start mass production after getting your approval and deposit, and we will handle the shipment.